Original hospital corridor to be remodeled

A portion of the corridor adjacent to the south side of the new cafeteria that connects the original University Hospital building to the Clinical Sciences walkway will be closed for construction beginning Monday, Nov. 19.
Detour signs will be posted in the area to help pedestrians find an alternative route around the construction site.
For more information, call the Construction Department at 4-1410.
Click here to download pdfs (
Cafeteria Renovation) (
Corridor Closing)